Heidelberg Cement, Schelklingen (DE)

Reliable even under extreme wind load

The cement plant Schelklingen of Heidelberg Cement AG requires a big-sized door in order to load and unload trucks laterally. Since the logistics hall is located in a non-wind-protected area there have been enormous problems with the previous steel roller shutter. The wind influenced the door operation in a way which made reliable door function and dispatch of goods impossible. Butzbach as the expert for big door dimensions managed the removal of the existing door and installed a stacking door HT150 with dimensions of appr. 12 x 5 m. The massive structure and the fibreglass material with its outstanding rigidity allow problem-free door operation even under high wind pressure. The formation of dust which appears along with cement handling does not create a negative impact on the door function as well. The Butzbach stacking door provides even more advantages – the roof construction is not charged with the door loads and the translucent fibreglass creates a brightly illuminated loading area – a fact which is highly appreciated by the forklift operators.

Products used:

Doors:

1 stacking door SPACELITE HT 150, size 11.6 x 4.7 m. Door panels in fibreglass, colour Brilliant, with 2 integrated windows.

Contact

Do you still have questions?

You are looking for a sales contact?

Just click here

Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies. More information